The delivery note is the document signed most often at a quarry, and the one that causes the most arguments at the end of the month. If the site is missing, the weight does not add up or nobody knows who signed it, the invoice is delayed and so is the payment. Here is what each aggregates delivery note should include, which parts of that come from regulation and which are simply common sense, so that you can invoice and stand behind every delivery.
What a delivery note is and what it is worth
The delivery note proves that goods have been delivered: what material, how much, to whom and when. Signed by the person receiving it, it is the best evidence you have if a customer disputes a load. But it is not an invoice. There is no general rule setting a standard delivery note model for aggregates, so its content is up to you. What is regulated is what comes afterwards: the invoice and, where applicable, the CE marking information that accompanies the product.
That is why the practical rule is simple: the delivery note should carry everything you will need to invoice, to prove the delivery and to know which material went to which site.
The details that should not be missing
| Detail | What it is for |
|---|---|
| Number and series | Identifying the delivery note without confusion and spotting gaps in the numbering. A separate series for each plant helps if you have several. |
| Date and time | Knowing which month to invoice and putting the day's loads in order. |
| Customer | Company name and tax ID (NIF), exactly as they will later appear on the invoice. |
| Site or destination | Separating the loads of a single customer between different sites, which are often invoiced separately. |
| Material | The exact item (for example, washed 6/12 gravel), not a generic "gravel". |
| Tare, gross weight and net weight | The quantity that is invoiced and how it was obtained. |
| Lorry and driver | Registration number and name: who took the material away. |
| Haulier and carriage | Whether transport is yours, a third party's or the customer's, so that carriage is invoiced correctly. |
| Price and payment method | Optional on the paper copy handed over, but useful in the system for pricing the delivery note without waiting until the end of the month. |
| Signature of the recipient | The proof of delivery. |
Weights: tare, gross and net
The net weight is what you charge for, so it is the figure that is disputed most. It is obtained by subtracting the tare (the empty lorry) from the gross weight (the loaded lorry). A few things that help avoid problems:
- Weigh the tare often. Always using a stored tare is convenient, but the fuel tank, mud or a change of body can alter it. The safest approach is to weigh the empty lorry on every entry.
- Wait for the weight to settle before recording it. A lorry that is still moving on the platform gives readings that fluctuate.
- Do not key in the weight by hand if the weighbridge can send it to the computer. Every number copied is a chance for error.
- Show all three values on the delivery note, not just the net. If someone raises a complaint, you can show how the figure was reached.
The delivery note and the invoice
The invoice does have mandatory content. The Reglamento de facturación (Real Decreto 1619/2012) (Spain's invoicing regulations) lists in its article 6 the details an invoice must include: number and series, date, details and tax ID (NIF) of the parties, addresses, a description of the transactions with the unit price before tax and any discount, VAT rate, VAT amount and the date of the transaction if it differs, among others. If your delivery note already records the customer, tax ID, material, quantity and price, the invoice almost writes itself.
At quarries it is common to invoice at the end of the month by grouping delivery notes. Article 13 of that regulation allows summary invoices: including in a single invoice transactions on different dates for the same recipient, provided they fall in the same calendar month. When the customer is a business or a professional, the invoice must be issued before the 16th of the following month. A delivery note with the wrong date can end up on another month's invoice.
In addition, invoicing software has to meet its own requirements: article 29.2.j of the Ley 58/2003, General Tributaria (Spain's General Tax Act), and its implementing regulation (the so-called RRSIF) require the software to guarantee the integrity and traceability of records. The application deadlines have been modified several times, so check the current situation with the Agencia Tributaria (the Spanish Tax Agency).
CE marking information
Aggregates placed on the market for construction are covered by harmonised standards and carry CE marking (we explain this in more detail in another article). With bulk material you cannot put a label on every stone. For that reason, Regulation (EU) 305/2011 provides in article 9.1 that, where it is not possible to affix it to the product or to a label, the CE marking is placed on the packaging or in the accompanying documents. That is why it is common for this information to appear on the delivery note or on a sheet that accompanies it, together with the reference to the declaration of performance.
The new Regulation (EU) 2024/3110 applies from 08/01/2026, but its article 95 keeps harmonised standards published under the previous regulation valid until they are withdrawn, and its article 94 keeps for those products the articles of 305/2011 on the declaration of performance and CE marking. For aggregates, for the time being, you carry on working as you have until now. Check with your notified body whether anything changes in your particular case.
The control document required for the road transport of goods is a different paper, with its own rules. It is explained in DeCA.
Common mistakes
- Delivery notes with no site, which force you to phone the customer to find out where to invoice.
- Different material names for the same product ("sand", "0/4 sand", "washed sand"), which spoil any later report.
- Handwritten weights that do not match the weighbridge ticket.
- Cancelled delivery notes that vanish without trace and break the numbering.
- Unsigned copies, or copies that get lost between the plant and the office.
How Arigest does it
Arigest generates delivery notes automatically with the weight it reads from the weighbridge. The sales delivery note records the plant, series, customer, site, lorry, driver, tare, gross weight and total weight, the item and the price. The weight is not keyed in: it arrives via the serial port and the user decides which weight to put on the delivery note once it has settled. It is explained on the weighbridge connection page.
With the delivery notes in the system, Arigest issues invoices with or without delivery notes involved, and its invoicing system complies with article 29.2.j of the Ley 58/2003 and the RRSIF. If you still have questions, see the frequently asked questions.