In aggregates, transport can weigh as much on the invoice as the material itself. That is why how you calculate and invoice haulage often decides whether a sale leaves a margin or not. Some quarries only sell ex-quarry, others deliver the material with their own lorries, and many combine their own lorries with contracted hauliers. This article reviews each arrangement, the ways of charging for haulage and the controls that stop you losing money along the way.
The four usual situations
| Situation | Who transports | What you invoice |
|---|---|---|
| Collection at the quarry | The customer, with their own lorry | Only the material, at the ex-quarry price |
| Own haulage | Your lorries and drivers | Material and haulage |
| Subcontracted third-party haulage | A haulier you hire yourself | Material and haulage; the haulier invoices you |
| Haulage hired by the customer | A haulier hired by the customer | Only the material; the haulier invoices the customer |
Distinguishing each case properly from the delivery note is the basis for everything else. The same customer may collect with their own lorry one day and ask you to deliver the material another day, and each delivery note has to reflect that.
Ways of charging for haulage
- Per tonne: easy to invoice because it uses the same weight as the delivery note. It is fair if the lorries always travel full.
- Per trip: a fixed amount per lorry, regardless of the load. It protects your cost when the customer orders small loads.
- By zone or distance: a table of prices depending on the destination. Useful if you serve many sites within a known radius.
- Mixed: a price per tonne with a minimum per trip. It combines the simplicity of the per-tonne rate with the protection of the per-trip rate.
Whichever system you use, put it in writing in the quote or in the customer's record, along with what happens with waiting time on site, difficult access or trips that cannot be unloaded.
What your own haulage costs you
To price haulage you need to know what each trip costs you. The costs of your own lorry fall into these groups:
- Variable costs per kilometre: diesel, tyres, maintenance and repairs, tolls.
- Driver costs: salary and social security contributions, spread over the hours actually worked.
- Fixed vehicle costs: depreciation or leasing, insurance, taxes, inspections, transport card.
- Downtime: waiting at loading and unloading, and the empty return journey, which also costs money.
For example, if a lorry makes an outward journey loaded and returns empty, the cost per loaded kilometre is double the cost per kilometre driven. It is a common mistake to calculate haulage using only the outward distance.
Then compare that cost with what a haulier would charge you for the same service. If third-party haulage is cheaper on certain routes, it may make sense to keep your own lorries for nearby sites or for customers who demand more flexibility, and subcontract the rest. The decision changes with your workload, so it is worth reviewing from time to time.
VAT and the invoice
When transport is part of the sale (your own haulage, or subcontracted haulage that you pass on to the customer), article 78.Dos.1.º of Ley 37/1992, del IVA (Spain's VAT Act) includes in the taxable base the haulage and transport costs charged by the person making the delivery. In other words, the haulage you charge is part of what is taxed; it is not a disbursement.
On the invoice, article 6.1.f of the Reglamento de facturación (Spain's invoicing regulations) requires the transactions to be described with all the data needed to determine the taxable base and the unit price excluding tax. The clearest approach is to separate the material and the haulage on different lines, each with its own quantity and price. That way the customer can compare your material price with that of other quarries and understand why the invoice goes up when the site is far away.
If the customer hires the haulier directly, that haulage does not appear on your invoice. There are specific obligations for road transport documentation, which you can look up at DeCA.
How to control third-party haulage
With subcontracted hauliers, the risk is paying for trips that were not made or failing to invoice trips that were. A simple monthly check:
- Pull the list of the month's delivery notes with third-party haulage, grouped by haulier and by lorry.
- Compare it with the haulier's invoice: number of trips, tonnes and agreed price.
- Check that each of those trips has been invoiced to the customer with its haulage.
- Review any differences before paying, not afterwards.
For this to work, each delivery note must carry the registration number and the driver, and each lorry must be linked to its haulier.
Common mistakes
- Delivery notes that do not say whether the transport is your own, third-party or the customer's.
- Haulage charged per tonne on sites that only accept half loads.
- Haulage rates that are not updated when diesel goes up.
- Paying the haulier for trips that have not been invoiced to the customer.
- Building haulage into the price of the aggregate, so nobody knows how much is earned on each part.
Haulage in Arigest
Arigest includes transport and haulage management within its comprehensive quarry management, alongside lorries, drivers, customers, sites and suppliers. Each sales delivery note records the lorry and the driver, as well as the customer, the site, the item, the price and the weight read from the weighbridge, which is the information you need to control trips. You can find it on the quarry management page.
For the costs of your own fleet, Arigest records vehicles, spare parts, consumption and incidents. And with purchase and sales invoices in the same program, you can set side by side what the haulier invoices you and what you invoice. See how invoices are issued in delivery notes and invoicing or the overview in features.