Putting a price on a tonne of aggregates seems simple until someone asks how much it really costs you to produce it. Many quarries set their price by looking at what the plant next door charges, and adjust it when a customer complains. That is a way to sell, but it does not tell you whether you are making money. In this article you will find a method for calculating the cost of each tonne at the quarry gate, splitting it across the products you make and turning it into a price that holds up.

What goes into the cost of a tonne

The quarry gate price is the price of the material loaded onto the customer's lorry, with no transport to the site. To arrive at it, you need to add up everything that happens between the working face and the weighbridge. Group the costs into blocks so that none is missed:

  • Extraction: drilling and blasting, or ripping and excavation if the material allows it. This includes explosives, staff and machinery at the face.
  • Loading and internal haulage: loaders, dump trucks and lorries that take the run-of-quarry material to the plant. Diesel, tyres, spare parts and machine hours.
  • Processing: crushing, grinding, screening and, if you do it, washing. Electricity, wear parts (jaws, cones, screens), water and sludge treatment.
  • Stockpiling and loading for the customer: the loader that moves the stockpiles and loads the lorries, and the weighbridge itself.
  • Staff: plant staff and the share of office staff who work on the quarry.
  • Depreciation: machinery, facilities and, where applicable, the cost of the land or mining rights.
  • Operating obligations: land restoration, guarantees, fees, insurance, quality controls and laboratory work.
  • Overheads: administration, consultancy, IT, financing.

The costs most often forgotten are depreciation and restoration. They do not leave the bank account every month, but they exist: if you do not build them into the price, you will end up paying for them out of your margin.

How to calculate the average cost step by step

  1. Choose a representative period. A full year is the most reliable, because it captures stoppages, breakdowns and the seasonality of construction work. If you only have a few months, bear in mind that the result may be distorted.
  2. Add up the costs for the period by block, with depreciation apportioned.
  3. Calculate the tonnes produced, not just those sold. If the stockpile has grown, that difference has also consumed diesel and electricity.
  4. Divide total cost by tonnes. That is your average cost per tonne of finished product.
  5. Separate fixed from variable costs. Diesel and wear parts rise with production; staff and depreciation far less so. Knowing this tells you how much the cost falls if you sell more and how much it rises if you sell less.

For example, if in a year your total costs come to X euros and Y tonnes leave the plant, the average cost is X/Y. What matters is not the number itself, but repeating the calculation every year using the same criteria to see whether things are improving or getting worse.

How to split the cost across the different products

A quarry does not produce a single material. The same blast yields gravel of several sizes, sand, crushed stone sub-base and fines. They are all extracted together, but they do not all go through the same number of processes. There are three common ways of splitting the cost:

CriterionHow it worksWhen it suits
Single average costAll products carry the same cost per tonne.Simple plants, with little differential processing.
By processExtraction is split equally; secondary crushing, washing or fine screening are charged only to the products that use them.Plants with washing or several grinding stages.
By market valueThe joint cost is split in proportion to the price each product can command.When some products are hard to sell and others are in high demand.

Splitting by process is the fairest method, but it requires knowing how many hours each piece of equipment works on each product. A reasonable starting point is to begin with the average cost and then separate the products that involve washing or extra grinding, which are the ones that deviate most.

Watch out for by-products. If a product builds up because there is no market for it, every tonne that leaves the plant for that stockpile still costs money. Sometimes it is better to sell it below the average cost than to pay to move and store it for years.

From cost to selling price

With the cost per product, you can now build your price list. The quarry gate price usually comes from three elements:

  • Cost per tonne of that product.
  • Margin you want to make, which does not have to be the same for every product.
  • Market: what the customer is willing to pay in your area, which depends on the distance to other quarries and on the construction work under way.

Next come adjustments by customer: volume discounts, payment terms or fixed prices for a specific job. Each of those adjustments has a cost. A customer who pays at 90 days with a volume discount may leave you with less than a small one who pays in cash. That is why it is worth having a general price list and recording the exceptions against each customer or each job, instead of negotiating lorry by lorry.

Transport is separate. If you deliver the material yourself, the haulage charge is calculated on its own logic (distance, type of lorry, waiting time on site) and should be shown separately from the price of the aggregates so that the customer can compare like with like.

Common pricing mistakes

  • Calculating with tonnes sold instead of tonnes produced, which inflates or understates the cost depending on how the stockpile has moved.
  • Not reviewing the price list when diesel, electricity or wear parts go up. A periodic review, even if only annual, avoids surprises.
  • Ignoring wastage: material lost in washing, in fines that are not sold or at the bottom of stockpiles.
  • Special prices with no expiry date, which carry on being applied years after the job that justified them has finished.
  • Delivery notes without a price that are priced from memory at the end of the month, with the risk of applying the wrong rate.
  • Not comparing what it costs to produce with what is actually invoiced by product and by customer.

How Arigest handles it

You do the cost calculation yourself, with your own figures. What you need afterwards is for the price you have decided on to reach every delivery note and every invoice without errors, and to be able to check that it is being applied. That is what Arigest is for, the software from Infonet Consultores for quarries and aggregate plants.

Arigest works with price lists and items, and each sales delivery note records the item and the price together with the weight read from the weighbridge. If the plant and the office work separately, prices are assigned to items and delivery notes are priced in the office, while delivery notes continue to be issued at the plant. Then invoices are issued with or without delivery notes involved.

To check whether the price list is working, Arigest has comparative charts of sales, costs and invoicing by different criteria, as well as customised reports. And from quarry management you record vehicles, spare parts, consumption and incidents, which make up an important part of the cost of each tonne. You can see everything it does in its features.

More articles from the blog

See all

Request information

So that we can get in touch, please fill in the form below.